Analysis on the installation method and precautions of high temperature resistant aluminum foil duct

by:Haikuo     2021-06-12
Analysis on the installation method and precautions of high temperature resistant aluminum foil duct
   Now we can see the existence of high-temperature aluminum foil ducts in different fields and environments. The installation of high temperature resistant aluminum foil ducts has always been the focus of attention. The role of aluminum foil duct is mainly to help us transport gas or as a part of the piping system. However, in different environments nowadays, air ducts of different specifications may be used. The installation of this type of pipe can be said to be very critical, because the impact on the later period is greater. Let's take a look at the basic precautions for the installation of high-temperature aluminum foil ducts.
The advantages of    high temperature resistant aluminum foil duct
  Aluminum foil duct has good airtightness, strength and flexibility. In addition, the high temperature resistant aluminum foil duct is very convenient to install, and there are fewer connection points, so it is easier to install. Not only that, but there will be no large ventilation resistance for such a duct. During operation, the noise is relatively small, and it is easier to manage, clean and maintain. Now the new generation of high-temperature resistant aluminum foil ducts on the market also use very high-quality materials, which makes the appearance more beautiful and looks more refined.
   high temperature resistant aluminum foil duct purchase
   For the purchase of aluminum foil ducts, consumers and businesses must remember not to blindly pursue low prices for aluminum foil ducts. Because high-quality products also require a certain amount of investment. And it is more troublesome to replace this kind of pipes after they are installed. So install one high-quality one at a time as much as possible, so that it can be used for a long time without frequent failures.

  High temperature resistant aluminum foil duct installation precautions
   First, before carrying out aluminum foil duct construction, the relevant operators must be familiar with the duct and tuyere layout. In addition, you must have a good understanding of design requirements, duct installation process steps, etc., and then conduct technical clarifications and discussions with the construction team.
   Second, in addition, before the aluminum foil duct is installed, professional quality safety personnel should conduct a comprehensive inspection of all construction equipment, tools and materials in accordance with the specified requirements. After ensuring that all items are qualified, the aluminum foil duct installation procedure can be carried out.
   Third, when the fan and the air duct are connected, a standard soft joint should be added at the air inlet and outlet. The size of this type of soft joint must be kept in a consistent state with the air inlet and outlet of the fan.
   Fourth, in addition, the fan hose connector can also choose canvas or standard artificial leather and other materials. You must know that the length of such a hose should not be less than 200 cm as much as possible, and the tightness should also be maintained. Moderate state. However, flexible hoses can help cushion the vibration generated by the fan during operation.
   Fifth, during the installation process of the high temperature resistant aluminum foil duct, there will be direct connections with heating equipment or dust removal equipment. When the relevant equipment is installed, you should take the prefabrication and system installation steps according to the actual surveying and mapping drawings.
   Sixth, when installing the aluminum foil duct, the inlet and outlet should be kept open when the duct is prefabricated. Simply put, it is to find a suitable position on the installed air duct and open the air outlet, and then the interface should be kept in a tight state.
   Seventh, the hoisting order of this type of duct should be in the order of the dry pipe first, then the branch pipe and the riser pipe. Furthermore, when hoisting, the hoisting point must be kept firm. Then the two lifting points should maintain a uniform force state. If you need to install a vertical aluminum foil duct, you can choose manual and large ropes for auxiliary installation. Then slowly adjust the verticality of the duct to make the verticality meet the requirements.
   The above is the analysis: the introduction of high temperature resistant aluminum foil duct installation methods and precautions, I hope to help friends in this area! For more information, please continue to pay attention to the Hangzhou Haikuo website, More exciting content will be presented later.